Dniprodzerzhynsk HPS.

847 
Моя оценка:
GuestBookEntry.rate.0
AbstractPOI.representative
AbstractPOI.manage AbstractPOI.curpage
feed.subscribe.do
feed.noSubscribers

Construction started in 1956 , in operation since 1964 (introduced by the first of the eight generating units ).

 

The structure of hydroelectric facilities are: .

 

  • single-chamber navigable sluice on the right bank of the Dnieper River valley ,.
  • powerhouse with eight units of 44 MW each, .
  • A concrete spillway dam 370 m long spillway with ten ,.
  • Channel left bank earthen dam and levee embankment Orel Valley (left bank of the Dnieper ,.
  • voltage switchgear 154 kV .
  •  

    The total installed capacity of power plant - 352 MW.Average annual output - 1.328 billion kWh with a head 10.5 m building the station without machine room , consists of eight modular sections, each unit is installed on a removable lid . Turbine - blade-type povortono capacity of 45.7 MW of production Turboatom (Kharkiv).

    umbrella type generators with a capacity of 44 MW with a voltage of 10.5 kV output PNA Uralelectrotyazhmash (Yekaterinburg). Delivery of electricity by four enlarged blocks , each of which consists of two generators and transformers.Length of waterfront dam 36.5 km , the maximum pressure of 15.5 m , capacity - 20 700 mi / sec.

    The dam forms a major station Dneprodzerzhinskoe reservoir.

    .